Electric Gates, Garage Door, Access Control, Smart Home & Security Forums

Full Version: Control Unit CLB202 Gate leaf learning issue
You're currently viewing a stripped down version of our content. View the full version with proper formatting.
Hi Guys,

I have MhouseKit WG20S kit (discontinued). Few months back the control unit CL20SK gave up the ghosts so ended up replacing it with clb202 as CL20S was no longer available. 

I’ve finally got a chance to getting round to installing the new control unit but have had a slight issue. 

When I go through the gate leaf opening and closing learning Cycle as per the instruction manual the gate leaf closes in the close position but the WG10SK Electro-Mechanical Worm Gear Motor continues to engage even after gate leaf closing is complete and the learning phase doesn’t end either.  

The flash light continues to blink along with P3 LED indicating thé learning phase is not complete. I have waited up to a minute hoping it would end eventually and the 2nd gate leaf will get engaged into the learning phase but it never happens. 

Didn’t take the risk of waiting more than a minute thinking it might fry the motor circuit.

I have tried multiple times even after power cycles to no avail. Any help or tips would be greatly appreciated. 

Many thanks 
Syed